Psalms for Sleep Music Album

A project in Rapid City, SD by Shane Heilman
000days 
:
00hours 
:
00minutes 

Funding Successful

An album of entire Psalms put to soothing music called "Psalms for Sleep."
Backers: 124
Average Pledge Per Backer: $49

Funded: $6,091 of $5,000
Dates: Jan 10th -> Feb 9th (30 days)
Project By: Shane Heilman
Tags:
Aw shucks, no tags yet. +Suggest

Suggest Tags

Begin typing to search or pick from a list. You can add multiple tags at the same time!
  • 2-player
  • 3d
  • 3d printing
  • action
  • action rpg
  • adventure
  • africa
  • african american
  • aircraft
  • aliens
  • android
  • animals
  • animation
  • anime
  • anthology
  • apparel
  • arduino
  • art
  • audio
  • bedding
  • beer
  • bees
  • big band
  • bluetooth
  • board game
  • books
  • camping
  • candy
  • card game
  • casual
  • cats
  • chocolate
  • classical music
  • clothing
  • cnc
  • coffee
  • comedy
  • comics
  • community project
  • component
  • conservation
  • console
  • cooperative game
  • country
  • craft
  • craft beer
  • creative commons
  • cyberpunk
  • cycling
  • dance
  • dice
  • dice game
  • diy
  • documentary
  • dogs
  • dragons
  • drm-free
  • dungeon crawler
  • dystopian
  • e-reader
  • eco
  • educational
  • ergonomics
  • expansion
  • fantasy
  • fashion
  • festival
  • fiction
  • film
  • first person shooter
  • folk music
  • food
  • furniture
  • gadget
  • game design
  • gardening
  • geocaching
  • gizmos
  • graphic design
  • graphic novel
  • handcrafted
  • headphones
  • health and fitness
  • hip hop
  • historic
  • home automation
  • horror
  • housewares
  • illustration
  • indie
  • indie rock
  • indigenous
  • instrument
  • ios
  • ipad
  • iphone
  • irish music
  • jazz
  • jewelry
  • kids
  • knit
  • lgbt
  • lighting
  • linux
  • locally sourced
  • lovecraft
  • mac
  • machining
  • magic
  • magnetic
  • maps
  • miniatures
  • minimalist
  • mmo
  • monsters
  • music
  • music video
  • native american
  • nature
  • ninjas
  • noir
  • non-fiction
  • oculus rift
  • open source
  • opera
  • organic
  • outdoors
  • ouya
  • painting
  • parody
  • party game
  • pc
  • pens
  • perceptual computing
  • periodical
  • pets
  • photography
  • pin-up
  • pinball
  • pirates
  • platformer
  • playing cards
  • podcast
  • point and click
  • pop music
  • post-apocalyptic
  • prehistoric
  • present-day theme
  • prints
  • programming
  • ps4
  • psvita
  • pulp
  • puppets
  • puzzle
  • racing
  • rap
  • raspberry pi
  • real time strategy
  • repurposed
  • retro
  • robots
  • roguelike
  • romance
  • rpg
  • sandbox game
  • scandinavian
  • science
  • science fiction
  • simulation
  • single-player
  • sleep
  • smartwatch
  • soccer
  • software
  • space
  • speakers
  • spiritual
  • sports
  • steampunk
  • stop motion
  • strategy game
  • stylus
  • superhero
  • survival
  • suspense
  • tabletop game
  • tarot
  • television
  • terrain
  • theatre
  • tile placement
  • timepiece
  • tower defense
  • toy
  • trading cards
  • travel
  • turn-based
  • uspcc
  • utopian
  • vehicle
  • video game
  • voxel
  • wallet
  • war game
  • watch
  • web series
  • wifi
  • wii u
  • wireless charging
  • world music
  • ww1
  • ww2
  • xbla
  • zombies
SubmitCancel
Saving your suggestions...
Suggestion Saved Successfully
Thank you for your help! The Kicktraq gnomes will get to work on your suggestions very soon.

Please keep in mind not all suggestions may be used, and repeated re-submissions may result in being rejected automatically (and we don't want that to happen).

If you have any questions, have a good idea for a tag, or a more in-depth suggestion - please feel free to let us know!

Ok
Hrm... something went wrong.
Hey, bad things happen to the best of us. Don't worry, the gnomes have been dispatched. Maybe try again in a little while.

Ok

$6,091

current pledge level
Last Updated: February 9 @ 14:11 -0500 GMT

121%

of goal
funding period ended

$0

trending toward
Trends are not projections. Read More >>

0%

of goal

(loading your very own snazzy kicktraq chart)
Latest News

WE DID IT!

February 9th - via: kickstarter.com
Thanks to you all, we have successfully funded Psalms for Sleep! With the campaign now complete, we'll be turning 100% of our energy toward completing the album and getting your bundles shipped to you ASAP!  Your bundle and Psalms for Sleep album... (Read More)

Update to Rewards! (Volume 5 Pre-Order)

January 18th - via: kickstarter.com
I just wanted everyone to know that every reward $35 and above will now include a pre-order of Volume 5 (CD and early download)! Since some people had already ordered some of the higher-priced bundles, we aren't able to "edit" those now, but we will... (Read More)

If you have additional news that doesn't appear here, shoot us a link!